This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Address and locality
- Storey County · Nevada
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000748
What the source record says
Built in 2021 in the Tahoe Reno Industrial Center area; Google began powering the campus with geothermal energy in 2023. Google reports more than $6 billion invested in Nevada since this campus was built. Google publishes no street address — the coordinate is the Storey County centroid (approximate).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Google Data Centers — US locations · Google
- Google Data Centers — Storey County, Nevada · Google
- Storey County, Nevada — Google Data Center Location · Google
- Google Plans to Invest in Nevada This Year · Nevada Governor's Office of Economic Development
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.