Licensed lead · not independently verified · dcd-dir-000736

Google Project Mica

source-reported under construction

Google

12701 N Arrowhead Trafficway · Kansas City · Clay County · Missouri

Planned 500 MWSource updated 24 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Project Mica.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Google
Address and locality
12701 N Arrowhead Trafficway · Kansas City · Clay County · Missouri
Official metro area
Kansas City, MO-KS
Source-reported status
under construction
Facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified)
Source freshness
24 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000736

What the source record says

Five hyperscale data center buildings on 493 acres, northeast of I-435 and US-169 in KC Northland (near Smithville, Clay County). Google committed $1.5M to Smithville School District and $250K to Northland Career Center. Coordinates are approximate for the site northeast of the I-435/US-169 interchange.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · source-reported proposed

    Google acquires ~493 acres in KC Northland; site originally known as Rocky Branch Creek Technology Park (formerly a QTS/Diode Ventures plan)

  2. 2025-07 · source-reported permitted

    City of Smithville and Port KC approve $10B campus; Google still unconfirmed publicly at this stage

    Open cited source →

  3. 2026-02 · source-reported under construction

    Google confirms Project Mica; construction already underway; first building expected within 18–24 months

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-project-mica-kc-northland-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →