This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CyrusOne Bosque County Campus (Thad Hill Energy Center).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- Bosque County · Texas
- Official metro area
- Waco, TX
- Source-reported status
- under construction
- Facility type
- data center
- Reported capacity
- Planned: 400 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000359
What the source record says
Referenced in CyrusOne's Freestone Energy Center release as a separate, already-agreed 400MW arrangement between Calpine and CyrusOne tied to the Thad Hill Energy Center in Bosque County (part of CyrusOne's >1,100MW contracted Texas power total). Secondary press (unconfirmed via direct fetch this session) additionally describes an Energy Capital Partners/KKR joint-venture financing of ~$4B for ~190MW at this site -- omitted here pending direct-source confirmation.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-26 · source-reported under construction
Calpine, Constellation and the ECP/KKR joint-venture announcement all describe the Bosque County campus (DFW10), adjacent to the Thad Hill Energy Center, as currently under construction and expected to be operational in Q4 2026. The record currently carries status 'proposed'.
Sources and attribution
- Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas · CyrusOne
- Calpine and CyrusOne Announce Phase 2 of Powered Land Agreement at Thad Hill Energy Center (190 MW + 210 MW = 400 MW) · Calpine
- Energy Capital Partners and KKR Announce Development of Hyperscale Data Center Campus in Texas — 'Construction of the project is underway' · Business Wire / Energy Capital Partners (via Internet Archive)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-bosque-county-thad-hill-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.