This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- Kings County · California
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 100 MW (source-reported; boundary not independently verified)
- Source freshness
- 23 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000368
What the source record says
Located at Naval Air Station Lemoore on the Kings/Fresno county border. Ameresco leads energy infrastructure via its Intelliscale platform; CyrusOne operates the data center for federal and defense AI workloads (FedRAMP, FISMA High, DoD IL5/IL6). Land leased from DOD. Announced September 9, 2025; first phase expected online 2027.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported proposed
Ameresco, U.S. Navy, and CyrusOne announced public-private partnership to build 100MW AI-optimized data center at NAS Lemoore; first phase expected online 2027; land leased from DOD
Sources and attribution
- Ameresco and U.S. Navy Partner to Build AI-Optimized Data Center and Energy Infrastructure at NAS Lemoore · Ameresco, Inc.
- Ameresco Partners with CyrusOne to Develop Offgrid AI Data Center at Naval Air Station Lemoore in California · Data Center Dynamics
- Groundbreaking for NAS Lemoore data center & energy project · Hanford Sentinel
- Gilcrease calls for dialogue over data center · Hanford Sentinel
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-nas-lemoore-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.