Facility snapshot
- Operator as published
- Core Scientific
- Address and locality
- Pecos · Reeves County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000316
What the source record says
High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> investmentUsd omitted. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported under construction
Core Scientific announced expansion of its Pecos campus toward ~1.5 GW gross power; first data hall reached interior-footing milestone, first capacity expected early 2027
Sources and attribution
- Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus · Core Scientific Inc.
- Core Scientific announces Q4 FY2025 results · Core Scientific
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-pecos-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.