Licensed lead · not independently verified · dcd-dir-000316

Core Scientific Pecos AI Campus

reported under construction

Core Scientific

Pecos · Reeves County · Texas

Planned 1,500 MWSource updated 8 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Core Scientific
Address and locality
Pecos · Reeves County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified)
Source freshness
8 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000316

What the source record says

High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> investmentUsd omitted. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported under construction

    Core Scientific announced expansion of its Pecos campus toward ~1.5 GW gross power; first data hall reached interior-footing milestone, first capacity expected early 2027

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-pecos-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →