Licensed lead · not independently verified · dcd-dir-000314

Core Scientific Denton Data Center (Denton 1)

reported under construction

Core Scientific

Denton · Denton County · Texas

Planned 260 MWSource updated 16 August 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Core Scientific
Address and locality
Denton · Denton County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 260 MW (source-reported; boundary not independently verified)
Source freshness
16 August 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000314
Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-02-26 · reported under construction

    Converted bitcoin-mining campus (8171 Jim Christal Rd) being rebuilt into a CoreWeave AI/HPC hub; renovation began Nov 2024, phased buildout continuing; full critical IT load reaches ~260MW after the Feb 2025 70MW expansion, with other coverage citing a 2027 full-site launch target.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-denton-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →