This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Core Scientific
- Address and locality
- Denton · Denton County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 260 MW (source-reported; boundary not independently verified)
- Source freshness
- 16 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000314
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-02-26 · reported under construction
Converted bitcoin-mining campus (8171 Jim Christal Rd) being rebuilt into a CoreWeave AI/HPC hub; renovation began Nov 2024, phased buildout continuing; full critical IT load reaches ~260MW after the Feb 2025 70MW expansion, with other coverage citing a 2027 full-site launch target.
Sources and attribution
- Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site · Core Scientific IR (BusinessWire-syndicated)
- Core Scientific: Denton, TX Data Center · Baxtel
- Denton, TX Data Center | High-Density at Scale · Core Scientific (operator site)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-denton-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.