Licensed lead · not independently verified · dcd-dir-000336

CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center

reported under construction

Core Scientific

Dalton · Whitfield County · Georgia

Capacity not statedSource updated 26 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Core Scientific
Address and locality
Dalton · Whitfield County · Georgia
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
26 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000336

What the source record says

Whitfield County BOC rezoning (3-2, tie broken by Chairman Jevin Jensen) approved March 2025 for 'heavy manufacturing' use (AI data center per contemporaneous reporting), conditioned on Enterprise Drive access. A June 2026 Whitfield Superior Court validated a $1.2B Integra SPV equipment-bond package tied to this ~167-173 acre site, naming CoreWeave Dalton II LLC as sublessee/operator. Same June 2026 hearing validated much larger CoreWeave Dalton / CoreWeave Dalton II bond series ($900M + $6.4B + $6.7B) that likely cover Core Scientific's OTHER Whitfield campus sites (Industrial South Road, Enterprise Drive) — those are separate parcels/rezonings and were not pursued as additional candidates this pass to avoid parcel-level double-counting; flagged for a future lane pass with GIS/parcel-level dedup once individual site addresses for those bond packages are confirmed. Core Scientific is site owner; CoreWeave Dalton II, LLC is sublessee/operator.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-04 · reported under construction

    under construction per Whitfield County Board of Commissioners rezoning vote, Old Tilton Road (Core Scientific)

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID coreweave-dalton-ii-old-tilton-road-whitfield-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.