This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Core Scientific
- Address and locality
- 1525 West 43rd Street South · Muskogee · Muskogee County · Oklahoma · 74401
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Operational: 70 MW; Planned: 1,000 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000315
What the source record says
1525 W Smith Ferry Rd, Port Muskogee Industrial Park. Distinct from the existing tracked Google Muskogee County campuses - same county, different developer/site. Coordinates are approximate. CoreWeave is the anchor customer.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04 · reported operational
Initial 100MW (70MW critical IT) phase delivered Q2 2026.
- 2026-07 · reported under construction
Second 82.5MW building under construction; expansion plan targets ~1.5GW gross power (~1.0GW leasable), including a pending acquisition of Polaris DS LLC (440MW OG&E contract).
Sources and attribution
- Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus · Core Scientific (investor release)
- Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center (investor press release)
- Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus · Business Wire
- Core Scientific announces 440 MW expansion at Oklahoma site · Blockspace
- Oklahoma Data Center | High-Density in Muskogee · Core Scientific
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-muskogee-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.