Licensed lead · not independently verified · dcd-dir-000312

Core Scientific Auburn Data Center (AUBix)

reported under construction

Core Scientific

1571 West Samford Avenue · Auburn · Lee County · Alabama · 36832

Planned 16 MWSource updated 15 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Core Scientific
Address and locality
1571 West Samford Avenue · Auburn · Lee County · Alabama · 36832
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 16 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000312

What the source record says

STATUS RE-CHECK, NO CHANGE APPLIED, BUT FLAGGED. Two sources fetched this run point toward the site already serving customers - Core Scientific sells it as a current product, and the February 2026 $55M permit is framed as an EXPANSION of an existing facility rather than a first build. Neither states outright that the data center is energized and serving load, and this record is a pre-existing AUBix building that Core Scientific leased, so the boundary between the incumbent facility and Core Scientific's fit-out is genuinely unclear. I did not promote under_construction to operational on marketing tense alone. Worth a targeted check of Core Scientific's 10-Q or an earnings call transcript, which I did not reach this run.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-02-19 · reported under construction

    Core Scientific leased the existing AUBix facility at 1571 W Samford Ave and is bringing it online in phases; first ~16MW targeted, full ~$400M build ongoing as of the Feb 2025 announcement.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID core-scientific-auburn-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →