Licensed lead · not independently verified · dcd-dir-000051

Shippingport Industrial Park

reported under construction

Aligned Data Centers

Shippingport · Beaver County · Pennsylvania

Planned 2,000 MWSource updated 12 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Aligned Data Centers
Address and locality
Shippingport · Beaver County · Pennsylvania
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 2,000 MW (source-reported; boundary not independently verified)
Source freshness
12 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000051

What the source record says

Two natural-gas-powered buildings in a 660-acre industrial park; construction potentially starting later 2026.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported proposed

    Open cited source →

  2. 2026-08-17 · reported permitted

    Conditional use largely granted. On January 28, 2026 Shippingport Borough Council approved most of Aligned's conditional use permit and related modifications for the campus ('Project Phoenix') — three data center buildings of 672,924, 638,000 and 638,000 sq ft plus a 147,000 sq ft warehouse/office building, on a 593-acre site of which roughly 400 acres would be graded, alongside a 70-acre natural gas power generation pad. Requested variances covered building height (45 ft to ~65 ft), clearing up to 75% of woodland, 24-hour construction noise, and a 65 dB noise limit measured at the nearest residence. PARTIAL: two noise-related items remain to be voted on, and mass grading, NPDES, stormwater and emergency management permits are filed but not yet issued.

    Open cited source →

  3. 2026-09-12 · reported under construction

    Aligned Data Centers broke ground on the 2 GW 'Project Phoenix' campus in Shippingport on September 10, 2026, moving the site from permitted to under construction.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aligned-shippingport-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →