Facility snapshot
- Operator as published
- Switch
- Address and locality
- Round Rock · Williamson County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 185 MW (source-reported; boundary not independently verified)
- Source freshness
- 16 August 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001408
What the source record says
Land purchase from Dell + rezoning approved per DCD and Round Rock city government release; project is Switch's 5th 'Prime' campus, not yet reported as fully operational. AI/HPC (likely): The Rock: exascale data center campus for hyperscale/high-density.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Switch facility directory · Switch
- OpenStreetMap way/1493169641 · OpenStreetMap
- Switch AI/HPC — The Rock: exascale data center campus for hyperscale/high-density · switch.com
- Community Impact: ERCOT/Oncor grid capacity for Round Rock data centers
- Switch sustainable data center design page (confirms 179MW renewable claim is Nevada-only, silent on TX)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID switch-the-rock-round-rock-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.