Licensed lead · not independently verified · dcd-dir-001267

Rowan Project Temple

reported under construction

Rowan Digital Infrastructure

Temple · Bell County · Texas

Planned 300 MWSource updated 8 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Rowan Digital Infrastructure
Address and locality
Temple · Bell County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
8 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001267

What the source record says

300 MW campus in Temple, Bell County; $3B financing secured, operations targeted 2027. Distinct from Rowan's separately-tracked Frederick, MD campus. Coordinates are the Temple area centroid. The '$3B' figure is green debt financing (May 2026), not campus capex; the abatement cites a ~$700M minimum investment floor -> investmentUsd omitted. ~600 construction / ~40 permanent jobs projected (abatement requires >=48 permanent) -> jobs honest-zero.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported under construction

    Rowan Digital began construction on a 300 MW data center in Temple, Bell County; $3B financing secured, operations targeted 2027

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID rowan-temple-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →