Licensed lead · not independently verified · dcd-dir-000952

Meta Temple Data Center

source-reported operational

Meta

3101 Industrial Blvd · Temple · Bell County · Texas

Operational 152 MWSource updated 26 August 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Temple Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Meta
Address and locality
3101 Industrial Blvd · Temple · Bell County · Texas
Official metro area
Killeen-Temple, TX
Source-reported status
operational
Facility type
data center
Reported capacity
Operational: 152 MW (source-reported; boundary not independently verified)
Source freshness
26 August 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000952

What the source record says

Three-building greenfield campus of more than 750,000 sq ft of data center and administrative space. JE Dunn lists the project status as completed. Meta reported $1.7m in direct funding to Bell County schools and nonprofits, including a $400,000 grant announced at the opening.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-04 · source-reported under construction

    JE Dunn began construction of the three-building, 386-acre campus in April 2022.

    Open cited source →

  2. 2026-07-22 · source-reported operational

    Meta brought the campus online as its first AI-optimised data center in the United States.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-temple-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →