Facility snapshot
- Operator as published
- Address and locality
- Van Buren Township · Wayne County · Michigan
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 1,000 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001157
What the source record says
Google confirmed evaluating the site. Coordinates are approximate. Developer: Panattoni Development Co. Status re-check, NO change: only PRELIMINARY site plan approval has been granted (February 2026, already before the record's 2026-08-08 basis). The final site plan vote is still pending, so the record correctly remains 'proposed'.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Van Buren Township OKs Google data center substation · Planet Detroit
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Van Buren Township — Data Center FAQ · Charter Township of Van Buren, Michigan
- Van Buren Township officials to consider final site plan for Google data center · Detroit Free Press via Yahoo News
- Google, DTE Van Buren data center contracts: 20-year special contracts before the MPSC, decision requested by September 10, 2026 · Planet Detroit
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID project-cannoli-van-buren-township-wayne-county-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.