Facility snapshot
- Operator as published
- Prime Data Centers
- Address and locality
- 1600 East Higgins Road · Elk Grove Village · Cook County · Illinois · 60007
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 175 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001148
What the source record says
Site-level figures, not entity-wide: the $1B and 175MW are stated for this Elk Grove Village campus at full build-out across three buildings; first building ORD-01 is 384,000 sq ft and up to 72MW. Status reflects the most recent sourced stage (2022 groundbreaking) — no fetched source confirms a live date, so this may lag reality. Distinct from the tracked TA Realty Elk Grove Village site (different operator, different parcel/acreage). Coordinates geocoded from the published street address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2022-11-15 · reported under construction
Official groundbreaking ceremony for ORD-01, the first of three planned campus buildings.
Sources and attribution
- Prime Data Centers Breaks Ground on $1B Chicago Data Center Campus in Elk Grove Village · Prime Data Centers via PR Newswire
- Prime Data Centers — Chicago data center campus · Prime Data Centers
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prime-ord-elk-grove-village-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.