Licensed lead · not independently verified · dcd-dir-001145

Avondale Campus

reported under construction

Prime Data Centers

Avondale · Maricopa County · Arizona

Planned 240 MWSource updated 10 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Prime Data Centers
Address and locality
Avondale · Maricopa County · Arizona
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 240 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001145

What the source record says

5-building, 66.5-acre campus; groundbreaking on first 3 buildings May 2026.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-05 · reported under construction

    Groundbreaking on first 3 buildings.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prime-avondale-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →