Facility snapshot
- Operator as published
- Address and locality
- West Memphis · Crittenden County · Arkansas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 15 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000751
What the source record says
Campus on Bolliger Road, West Memphis. Coordinates approximate for the Bolliger Road industrial area. $4B is Phase 1 through 2027; total planned investment is $10B, which would be the largest private capital investment in Arkansas history. Five data center buildings on 920-acre campus footprint within a 1,178-acre site (per U.S. Army Corps of Engineers filing). Fixes: (1) removed unsourced 5,000 construction jobs figure — AEDC states only 'thousands'; (2) corrected energy.source from 'solar' to 'grid' — facility draws from Entergy Arkansas; Arkansas Cypress Solar is a companion renewable project; (3) corrected landAcres from 1,200 to 1,178 per Army Corps filing.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported proposed
Google (operating via subsidiary Groot LLC) identified as buyer of parcels in West Memphis purchased late 2024
- 2025-10 · reported under construction
Official groundbreaking ceremony October 2, 2025; five large-scale data center buildings plus substation and support infrastructure planned
Sources and attribution
- Google Locating New Data Center in West Memphis, Arkansas with Multi-Billion Dollar Investment · Arkansas Economic Development Commission
- Google, state and local officials mark start of $4 billion AI data center in West Memphis · Arkansas Advocate
- Google's contribution was at issue in Arkansas regulators' review of Entergy contract · Arkansas Democrat-Gazette
- Arkansas utility seeks approval of 1.4GWh hybrid BESS, with financial support from Google as part of data centre deal · Energy-Storage.news
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-west-memphis-ar. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.