Google Stillwater Data Center Campus

reported under construction

Google

Stillwater · Payne County · Oklahoma

Capacity not statedSource updated 14 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Google
Address and locality
Stillwater · Payne County · Oklahoma
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000747

What the source record says

Campus at intersection of Perkins Road and Richmond Road, north of Stillwater. Coordinates are approximate (city centroid shifted north). Up to 6 data center buildings, each 300,000 sq ft. Phase I targeted for 2027. City Council acceptance of final plat required before recording with Payne County Clerk. Job figures are projections (~30 permanent per phase; construction cited as 'thousands') - not recorded as confirmed counts. Oklahoma's Sec. 1357 data-center sales-tax exemption applies by statute but no Stillwater-specific award amount is published.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-03 · reported proposed

    Google confirmed as applicant for Stillwater campus (400 acres, up to $3B, 6 buildings). Part of $9B Oklahoma investment.

    Open cited source →

  2. 2025-11 · reported permitted

    Stillwater Planning Commission approves final plat 4-0 on November 13, 2025. Building permits for Lots 1 and 2 already approved; infrastructure work can begin.

    Open cited source →

  3. 2026-07-21 · reported under construction

    Google's Stillwater campus (Perkins & Richmond Roads) has moved from permitted into active construction: building permits for Lots 1 & 2 approved, first-phase 300,000 sq ft building underway and Richmond Road paving started, with the initial building targeted operational in 2026 — advancing from the Nov 2025 'construction go-ahead' permitted stage.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-stillwater-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →