Facility snapshot
- Operator as published
- Address and locality
- Monrovia · Morgan County · Indiana
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 390 MW (source-reported; boundary not independently verified)
- Source freshness
- 5 August 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000735
What the source record says
Codename 'Project Louie'; Google initially concealed via shell company 'Woodland Caribou LLC'. Campus totals approximately 550 acres in Morgan Township east of Monrovia (bounded by Keller Hill Rd, N Antioch Rd, SR-42, W Union Church Rd); additional ~80 acres acquired within Monrovia town limits, bringing total Google holdings to ~628 acres. Planned 1,200 MW AES Indiana substation per IURC Cause No. 46394 (filed Apr 22 2026); that figure is the utility substation capacity ceiling, not a confirmed steady-state data center load — treated as notes per spec. Six buildings plus substation planned. Reported total investment ~$1 billion (IDS News; not confirmed as a firm Google-stated commitment — left out of investmentUsd). Land acquisition spend: ~$78 million for ~15 parcels Sep–Nov 2025. Coordinates approximate (site east of Monrovia near SR-42/Keller Hill Rd area). Annexation dispute with Town of Monrovia active July 2026: county transferred Google parcels to RDC under IC 36-4-3-4.3 to block annexation; Google offered $12M sewer plant upgrade to Monrovia to drop the effort.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · reported proposed
Rezoning applications filed under shell company 'Woodland Caribou LLC'; Google confirmed as developer October 2025 via public affairs manager Broderick Green
- 2025 · reported permitted
Morgan County approved first rezoning (Sept 2025) and second rezoning adding ~158 acres (Oct 2025), bringing campus to ~550 acres; development agreement including tax abatements approved May 2025
- 2026 · reported under construction
Site preparation underway April 2026; Mortenson (general contractor), Gradex (site prep/earthwork); AES Indiana IURC Cause No. 46394 filed Apr 22 2026
Sources and attribution
- Google behind 390-acre data center development in Morgan County, Indiana · Data Center Dynamics
- The billion-dollar neighbor: Data center special report · Indiana Daily Student
- Google reveals itself as developer behind 500-acre Morgan County data center campus · Daily Journal
- IURC Must Prioritize Public Interest in AES Indiana Data Center Proposal · Citizens Action Coalition
- AES Indiana Lee Direct Testimony, IURC Cause No. 46394 (filed Apr 22 2026) · Indiana Utility Regulatory Commission
- Google pressures Monrovia to end annexation effort · Morgan County Correspondent
- The billion-dollar neighbor coming to Morgan County · Indiana Daily Student
- Morgan County data center project advances despite major community pushback · WTHR (NBC Indianapolis)
- AES Indiana plans 1,200-megawatt substation for Morgan County data center · Daily Journal (Johnson County, IN)
- AES Indiana details plan to power proposed Google data center southwest of Indianapolis · Indianapolis Business Journal
- Indiana regulators OK energy project tied to Google's Morgan County data center · Inside INdiana Business
- Activist group blasts energy project related to Monrovia data center · Indiana Public Media
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-project-louie-monrovia-in. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.