Google Jackson County Campus

reported operational

Google

Stevenson · Jackson County · Alabama

Capacity not statedSource updated 9 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Google
Address and locality
Stevenson · Jackson County · Alabama
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000717

What the source record says

Campus operational since 2019 at the former TVA Widows Creek coal-plant site (~4.8 mi east of Stevenson). Recorded status is 'operational' (the campus is built and running); a $1.5B expansion announced June 15 2026 is under construction for 2026-2027 (captured in statusHistory). CAPACITY OMITTED: the widely cited 300 MW is Google's contracted new generation across the Tennessee Valley REGION, not a campus-specific figure. TVA partnership also includes a 2025 Kairos Power agreement for up to 50 MW of advanced nuclear for Google's AL/TN data centers (~2035). Construction workforce of 1,000+ is a projection (in notes, not jobs). Baxtel labels this 'Google Bridgeport'; TVA/Wikipedia/postal (35772) place Widows Creek near Stevenson - Stevenson used. 360-acre site; coordinates from the Widows Creek plant.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2015-06-24 · reported proposed

    Google announced a $600M data center at the former TVA Widows Creek coal-plant site in Jackson County

  2. 2018-04 · reported under construction

    Groundbreaking on the original $600M campus; 360-acre site off County Road 96

  3. 2019-01 · reported operational

    Original campus operational with two buildings (~135,000 sq ft each)

  4. 2026-06-15 · reported under construction

    $1.5B expansion announced; construction planned for 2026-2027; 1,000+ contract workers expected

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-jackson-county-stevenson-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →