DC BLOX Myrtle Beach Cable Landing Station

reported operational

DC BLOX

1401 Howard Avenue · Myrtle Beach · Horry County · South Carolina · 29577

Planned 19 MWSource updated 10 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
DC BLOX
Address and locality
1401 Howard Avenue · Myrtle Beach · Horry County · South Carolina · 29577
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Planned: 19 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000433

What the source record says

125,000 sq ft and 19 MW at full build-out, in the International Technology & Aerospace Park. Landing point for the Google Firmina and Nuvem cables and Meta's Anjana cable. DC BLOX announced an expansion on 2025-10-14 to add capacity for five more subsea cables. Coordinates come from the named OSM feature for the facility itself. Re-checked 2026-09-10 (DC BLOX's own Myrtle Beach facility page, source dated after this record's 2026-08-26 lastUpdated): status unchanged, still operational (with a second facility on the same campus 'in development' per the expansion announcement) — no flip. energy: confirmed absence — no utility name or grid/on-site-generation disclosure found in any source checked. investmentUsd: confirmed absence — neither the 2023 opening announcement nor the Oct 2025 expansion announcement discloses a dollar figure for Myrtle Beach specifically (DC BLOX's disclosed green-loan financing figures apply company-wide/to other campuses, not this site). aiClassification: left unset — CEO framing ('leverage this infrastructure to create an AI-driven future') is generic aspirational language about the company's broader direction, not a statement that this cable-landing-station site itself is AI-dedicated; not enough to classify. jobs: confirmed absence — no jobs figure in any source checked. subsidies: confirmed absence in every press source checked (DC BLOX's own site, the 2023 opening announcement, the Oct 2025 expansion announcement) — no FILOT or incentive agreement mentioned. This is a press-coverage-level absence only; Horry County's council-minutes/ordinance portal and the ITAP authority's own site were not reachable this session (DNS failures on guessed domains), so a stronger county-tier confirmation is unresolved, not ruled out. community: confirmed absence of independent local-reception reporting — a Sept 8 2026 company-wide 'Community Commitment' pledge announcement references Myrtle Beach only via a linked headline, not in its own body text, so it does not count as site-specific community evidence and was not used to set community.status.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-10-10 · reported operational

    DC BLOX opened the cable landing station, the first subsea cable landing facility in South Carolina.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID dc-blox-myrtle-beach-cls-sc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.