Licensed lead · not independently verified · dcd-dir-000263

Cloverleaf Project Open Sky

reported proposed

Cloverleaf Infrastructure

Piedmont · Canadian County · Oklahoma

Planned 1,500 MWSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Cloverleaf Infrastructure
Address and locality
Piedmont · Canadian County · Oklahoma
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000263

What the source record says

630-acre proposed data campus near the Mathewson Substation, NW 248th Street, Piedmont (Canadian/Kingfisher county line) — part of a transmission corridor drawing multiple competing proposals; see beltline-piedmont-kingfisher-county-ok (this same batch), a separate, distinct 321-acre Beltline Energy site nearby — do not conflate despite both being in Piedmont. Closed-loop cooling planned. Cloverleaf recently withdrew from two Wisconsin data center projects after local opposition (context, not this project). Reported as 'over $1 billion taxable investment' (DCD) — read as a tax-abatement eligibility threshold rather than a confirmed capex figure, so not populated as investmentUsd.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cloverleaf-project-open-sky-piedmont-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →