Facility snapshot
- Operator as published
- Cloverleaf Infrastructure
- Address and locality
- Troy · Lincoln County · Missouri
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 500 MW (source-reported; boundary not independently verified)
- Source freshness
- 7 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000266
What the source record says
500 MW full-buildout campus near Troy, Lincoln County (near St. Louis); construction from early 2027. Single-tracker source → confidence reported. Coordinates are the Troy area centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported proposed
Cloverleaf Infrastructure planning a 500 MW campus near Troy, Lincoln County (near St. Louis); construction from early 2027
Sources and attribution
- List of upcoming data center projects in Missouri · Blackridge Research
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cloverleaf-troy-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.