Licensed lead · not independently verified · dcd-dir-000257

CloudHQ Manassas MCC Campus

reported under construction

CloudHQ

Manassas · Prince William County · Virginia

Planned 382 MWSource updated 16 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
CloudHQ
Address and locality
Manassas · Prince William County · Virginia
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 382 MW (source-reported; boundary not independently verified)
Source freshness
16 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000257

What the source record says

Seven-building campus; 382 MW total planned critical IT load; 96 MW currently available. Coordinates sourced directly from CloudHQ website (38.71955, -77.49819). Connects via Manassas Fiber Highway to CloudHQ's MDC campus.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01 · reported proposed

    Seven-building, 2.2 million sq ft campus planned south of Routes 28 and 234 intersection in Manassas

    Open cited source →

  2. 2025-06 · reported under construction

    MCC7 construction commenced mid-2025 (expected RFS Q3 2026); MCC5 site-plan approved and ready for development

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cloudhq-manassas-mcc-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →