This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Bitdeer
- Address and locality
- East Wenatchee · Douglas County · Washington
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 13 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000192
What the source record says
Bitdeer's Washington datacenter, referred to as "Pangborn, Washington" in its SEC filings (Pangborn Memorial Airport is in Douglas County, East Wenatchee) and as "Wenatchee, Washington" by aggregators. Originally deployed for Bitcoin mining in May 2018; 13 MW electrical capacity in use as of March 31, 2026. Bitdeer is converting the site to AI cloud use: AI datacenter design documents and building-permit applications submitted, core equipment being delivered, planned to begin with an NVIDIA GB300 cluster; dismantling of the crypto mining datacenter began March 2026 with conversion completion targeted for Q4 2026. Classified data_center (mid-conversion to AI), consistent with the tracked Bitdeer Knoxville TN conversion. Coordinates approximate (Pangborn area, Douglas County). Distinct from Bitdeer's tracked Ohio (Massillon/Clarington/Niles/Shalersville), Texas (Rockdale) and Tennessee (Knoxville) sites. Public-reception check (2026-09-10): Checked Bitdeer's own SEC 20-F annual report (2026-09-10); it mentions Wenatchee, WA only twice (as a mining-to-AI-datacenter conversion site, and as a single-supplier electricity contract location), with no discussion of community reception, hearings, or local reaction.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-17 · reported under construction
Sources and attribution
- Bitdeer Technologies Group FY2025 Form 20-F (filed 2026-04-30) — Item 4.D Property: Pangborn, Washington datacenter, 13 MW, operational May 2018, being converted to AI cloud (GB300 cluster; permits submitted; crypto dismantling began March 2026; target Q4 2026) · U.S. Securities and Exchange Commission (EDGAR)
- Data Center Map — Bitdeer Wenatchee, Washington (13 MW) · Data Center Map
- DCD — Bitdeer crypto-to-AI conversion program (Washington among the sites being converted, GB300, Q4 2026) · Data Center Dynamics
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID bitdeer-wenatchee-pangborn-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.