Facility snapshot
- Operator as published
- Bitdeer
- Address and locality
- Knoxville · Knox County · Tennessee
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 86 MW (source-reported; boundary not independently verified)
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000190
What the source record says
Existing Bitmain/Bitdeer Bitcoin mining site operational since May 2020 (property acquired 2018 via Commercial Purchase and Sale Agreement with Kemet Foil Manufacturing LLC, 9.88 acres / 77,678 sq ft industrial building). The 20-F discloses an active conversion to AI cloud use: Phase 1 (37MW) targeted Q4 2026, Phase 2 (49MW) targeted Q1 2027, against 86MW total electrical capacity in use as of 2026-03-31. Coordinates are an approximate parcel-area estimate for the South National Drive industrial corridor in Knox County (near APN 110-02627 per public tax-assessment/LoopNet listing) since no geocoder was available in-session to pin the exact parcel centroid — flagging for a follow-up precision pass if the site is approved. Crypto-mining site converting to AI (Bitdeer 20-F): Phase 1 37 MW targeted Q4 2026, Phase 2 49 MW Q1 2027; zero AI capacity live today (the existing 86 MW is legacy mining load being phased out). Status re-checked 2026-09-09: no change. Bitdeer's own filing still describes the Knoxville AI conversion as in design/build with a Q4 2026 target, so the record stays under_construction.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04-30 · reported under construction
under construction per Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30
Sources and attribution
- Bitdeer Technologies Group FY2025 Form 20-F, filed 2026-04-30 · SEC EDGAR (Bitdeer Technologies Group, CIK 0001899123)
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID bitdeer-knoxville-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.