This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Bitdeer
- Address and locality
- Clarington · Monroe County · Ohio
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 570 MW (source-reported; boundary not independently verified)
- Source freshness
- 9 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000189
What the source record says
Clarington, Monroe County; 570 MW via an AEP Ohio LOA, targeted available by end of Q3 2026. Bitdeer transitioning from bitcoin mining toward HPC/AI. Coordinates are the Clarington area centroid. No Clarington-specific capex, water, or jobs figures are disclosed; Bitdeer's 2026 mining capex guidance is company-wide and excludes AI/HPC. Some cooling/jobs figures in secondary coverage describe Bitdeer's separate Shalersville (Portage County) site, not Clarington.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11 · reported under construction
Bitdeer signed a Letter of Agreement with AEP Ohio; full 570 MW targeted available by end of Q3 2026 (crypto→HPC/AI)
Sources and attribution
- Bitdeer announces November 2025 production and operations update · Bitdeer Technologies Group
- Bitdeer announces September 2025 production and operations update · GlobeNewswire / Bitdeer
- Bitdeer expands power pipeline with 570 MW Monroe County partnership · GlobeNewswire / Bitdeer
- Bitdeer Form 6-K (American Heavy Plate Solutions leasehold litigation disclosure) · U.S. Securities and Exchange Commission
- Bitdeer Announces February 2026 Production and Operations Update · Bitdeer Technologies Group via GlobeNewswire
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID bitdeer-clarington-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.