Facility snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Massaponax · Spotsylvania County · Virginia
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 26 July 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000164
What the source record says
One of Amazon Web Services' four Spotsylvania/Caroline data center campuses (Summit Crossing, Carter's Store, Cosner [tracked as aws-cosner-technology-campus-massaponax-va, ST23-0031], Orrock [tracked as aws-mattermeade-caroline-va]). ~231 acres, up to ~2.1M sq ft of data center buildings (Phase 1 max ~900k sq ft). Located on the south side of Summit Crossing Road, ~0.5 mi west of the Spotsylvania/Caroline county line; borders the Carter's Store campus. Amazon Data Services filed June 2023 to rezone from Rural (RU) to Industrial-1 (I-1); Board of Supervisors approved the four AWS rezonings in a 5-2 vote in October 2023 (Spotsylvania "ST23" case series). Reported under construction / buildings going up per The Fredericksburg Advance (2026). Coordinates approximate (Summit Crossing Road geocode; parcels not GIS-confirmed this pass).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-17 · reported under construction
Sources and attribution
- Data Center Frontier — Amazon plans major data center expansion in Spotsylvania County (Summit Crossing: 231 ac, 2.1M sq ft) · Data Center Frontier
- The Fredericksburg Advance — Digital Insights: status of data centers in Spotsylvania (all four AWS campuses under construction, buildings going up) · The Fredericksburg Advance
- Baxtel — Amazon Summit Crossing Tech Campus (231 ac, Phase 1 max 900k sq ft, rezoning approved Oct 2023) · Baxtel
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-summit-crossing-tech-campus-spotsylvania-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.