This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Laveen · Maricopa County · Arizona
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 25 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000149
What the source record says
~220-acre land acquisition ($277M) near Loop 202 & Dobbins Rd, Laveen (Phoenix), Maricopa County. No capacity, utility, or AI-specific program announced yet — recorded as proposed / mixed_use pending a construction announcement (re-review trigger). Coordinates are the Laveen area centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported proposed
Amazon (via Amazon Data Services) acquired ~220 acres near Loop 202 & Dobbins Rd in Laveen (Phoenix) for a possible data center; $277M land purchase
Sources and attribution
- Amazon acquires 220 acres in Phoenix, Arizona for possible data center · Data Center Dynamics
- Arizona Technology Council — Amazon buys massive Valley site
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-laveen-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.