Facility snapshot
- Operator as published
- Vantage Data Centers
- Address and locality
- South Fulton · Fulton County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 28 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001544
What the source record says
754,000 sq ft, targeted completion January 2028. Vantage filed a second Fulton County DRI the same period (Stacks Road, ~697,000 sq ft, January 2027) which is not recorded separately here because no fetched source gave it a distinguishable location.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-28 · reported proposed
Development of Regional Impact application filed with the Georgia Department of Community Affairs for a 754,000 sq ft data center, completion targeted January 2028.
Sources and attribution
- Vantage Data Centers Plans Two New Sites in Georgia (Westlake and Stacks Road, Fulton County) · Inside Towers
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID vantage-westlake-south-fulton-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.