This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Vantage Data Centers
- Address and locality
- Shackelford County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 1,400 MW (source-reported; boundary not independently verified)
- Source freshness
- 5 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001529
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · reported proposed
Part of Stargate expansion; $25B mega-campus on 1,200 acres at Hwy 604 / Hwy 351 intersection; ~125 miles W of Fort Worth
- 2025 · reported under construction
Ground broken; first building delivery targeted H2 2026; 10 buildings planned totaling 3.7M sq ft
Sources and attribution
- Vantage Data Centers Unveils Plans for Frontier, a $25B Mega-campus in Texas — Vantage · Vantage Data Centers
- Vantage breaks ground on Texas gigawatt data center campus for OpenAI — Data Center Dynamics · Data Center Dynamics
- Oracle and OpenAI Texas data center to run on 700MW natural gas microgrid · Construction Owners
- Vantage Shackelford County, TX campus · Vantage Data Centers
- Data center plans move forward in Shackelford County · The Albany News
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID vantage-frontier-shackelford-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.