Licensed lead · not independently verified · dcd-dir-001442

TeraWulf Morgantown Generating Station AI Campus

reported proposed

TeraWulf

Charles County · Maryland

Planned 1,000 MWSource updated 10 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
TeraWulf
Address and locality
Charles County · Maryland
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001442

What the source record says

Morgantown Generating Station is on the Potomac River near the Governor Harry W. Nice Memorial Bridge, Charles County MD. Acquisition funding and TeraWulf financial stability questioned by Maryland Office of People's Counsel (net losses $660M+ in 2025, 90% revenue from Bitcoin mining). Coordinates approximate. TeraWulf sought about $100M in Maryland state funds toward the Morgantown acquisition; the purchase price is withheld from FERC as confidential (FOIA Exemption 4), which Public Citizen is petitioning to disclose. No cooling design, water-withdrawal figure, confirmed subsidy, or job count has been publicly disclosed for the proposed AI campus. Re-checked 2026-09-10: overall record status correctly remains PROPOSED. Material development since lastUpdated (2026-07-23): FERC ruled 2026-07-29 that the ownership transfer of Morgantown Generating Station to TeraWulf is consistent with the public interest, but the order explicitly does not authorize data-center construction, new/repowered generation, or interconnection changes -- so 'proposed' remains the correct enum. Purchase price was kept confidential by FERC order (no investmentUsd figure obtainable). No water/cooling or jobs figures found this run. [Applier note 2026-09-10: the finding proposed only location.city, which the enrichment intent schema deliberately does not accept (enrichment fills street and postalCode only and cannot change a facility's city). Converted to a notes-only finding so the substantive research lands; the proposed city change needs a maintainer hand-edit.]

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-02 · reported proposed

    TeraWulf announced acquisition of Morgantown Generating Station (250 buildable acres, ~210 MW current operational capacity) from existing owner. Acquisition pending FERC approval and third-party consents (expected Q2 or Q3 2026 closing). Zoning text amendment (ZTA) required. TeraWulf shifting from Bitcoin mining to AI/HPC data centers.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID terawulf-morgantown-charles-county-md. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →