Licensed lead · not independently verified · dcd-dir-001440

Justified Data Campus

reported under construction

TeraWulf

Hawesville · Hancock County · Kentucky

Planned 401 MWSource updated 15 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
TeraWulf
Address and locality
Hawesville · Hancock County · Kentucky
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 401 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001440

What the source record says

Brownfield redevelopment of former Century Aluminum smelter. Site acquired February 2026 from Century Aluminum subsidiary; acquisition price reported by multiple outlets as $200M cash plus a 6.8% minority equity interest in TeraWulf (not confirmed in official PR text fetched). Lease entity: TeraWulf's Raylan Data LLC to Anthropic PBC. The ~$19B is contracted lease revenue over the 20-year term — not capex; excluded from investmentUsd. TeraWulf indicated a $3B–$4B construction investment for two data center buildings (range, not a firm single figure; excluded from investmentUsd). Site has ~480 MW of existing power availability; 401 MW is the Anthropic lease capacity. Total site ~750 acres per news sources; TeraWulf's official PR cited 'over 250 buildable acres.' Coordinates are approximate (Hawesville town center). Fluidstack/Abernathy JV is a separate unrelated transaction — excluded from this record.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported permitted

    TeraWulf acquired ~750-acre former Century Aluminum smelter site from Century Aluminum subsidiary; Justified Data campus announced February 2, 2026.

    Open cited source →

  2. 2026 · reported under construction

    20-year lease signed with Anthropic PBC (via TeraWulf's Raylan Data LLC entity) for 401 MW critical IT load; ~$19B contracted lease revenue over initial term. Initial capacity targeted H2 2027; full 401 MW ramp by early 2028. Announced July 6, 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID terawulf-hawesville-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections