Facility snapshot
- Operator as published
- TeraWulf
- Address and locality
- Hawesville · Hancock County · Kentucky
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 401 MW (source-reported; boundary not independently verified)
- Source freshness
- 15 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001440
What the source record says
Brownfield redevelopment of former Century Aluminum smelter. Site acquired February 2026 from Century Aluminum subsidiary; acquisition price reported by multiple outlets as $200M cash plus a 6.8% minority equity interest in TeraWulf (not confirmed in official PR text fetched). Lease entity: TeraWulf's Raylan Data LLC to Anthropic PBC. The ~$19B is contracted lease revenue over the 20-year term — not capex; excluded from investmentUsd. TeraWulf indicated a $3B–$4B construction investment for two data center buildings (range, not a firm single figure; excluded from investmentUsd). Site has ~480 MW of existing power availability; 401 MW is the Anthropic lease capacity. Total site ~750 acres per news sources; TeraWulf's official PR cited 'over 250 buildable acres.' Coordinates are approximate (Hawesville town center). Fluidstack/Abernathy JV is a separate unrelated transaction — excluded from this record.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported permitted
TeraWulf acquired ~750-acre former Century Aluminum smelter site from Century Aluminum subsidiary; Justified Data campus announced February 2, 2026.
- 2026 · reported under construction
20-year lease signed with Anthropic PBC (via TeraWulf's Raylan Data LLC entity) for 401 MW critical IT load; ~$19B contracted lease revenue over initial term. Initial capacity targeted H2 2027; full 401 MW ramp by early 2028. Announced July 6, 2026.
Sources and attribution
- TeraWulf Announces Anthropic Lease at Justified Data Campus · TeraWulf Inc.
- TeraWulf Announces Anthropic Lease at Justified Data Campus (GlobeNewswire) · GlobeNewswire
- TeraWulf Expands Digital and Power Infrastructure Portfolio — Kentucky and Maryland Acquisitions · TeraWulf Inc.
- TeraWulf Expands Digital and Power Infrastructure Portfolio (GlobeNewswire, Feb 2026) · GlobeNewswire
- Big Rivers Electric Corporation — PSC Retail Service Agreement Filing for Justified Data Project · Kentucky Public Service Commission
- Hawesville smelter to become AI data center; community split on economic impact · Spectrum News 1
- TeraWulf signs 20-year Anthropic lease for 401 MW at Kentucky data campus · Blockspace
- Anthropic signs $19bn, 20-year lease for Kentucky data center with TeraWulf · Data Center Dynamics
- AI company Anthropic commits to long-term Hawesville campus · Spectrum News 1
- Construction Dive — Terawulf taps Fluor for preconstruction on $3B Kentucky data center
- Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus · TeraWulf Inc.
- Data centers need massive power. They're eyeing Kentucky's idle industrial sites to get it. (Century Aluminum smelter site, Hancock County, 482 MW, wholesale power via the MISO market) · Hoptown Chronicle / Kentucky Lantern
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID terawulf-hawesville-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.