TeraWulf AI Data Center Campus, Lansing

reported proposed

TeraWulf

Lansing · Tompkins County · New York

Planned 400 MWSource updated 14 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
TeraWulf
Address and locality
Lansing · Tompkins County · New York
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 400 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001441

What the source record says

Site is the former Cayuga Power Plant (coal-fired, retired). NYSDEC water permit application for Cayuga Lake withdrawal was originally filed in 2021 for 'unspecified future use.' Permit dates to 1955 without modern monitoring requirements per opposition. TeraWulf also has a separate cryptomining operation at the Susquehanna site in PA (Nautilus). Operating entity: Cayuga Operating Company (acquired plant). NO STATUS CHANGE. The April 2026 DEC water-withdrawal/SPDES action is explicitly for the existing power plant's current operations, not the data center; DEC states it is 'not associated with the proposed data center'. As of the sources fetched 2026-09-09 the project remains proposed and had not cleared local site-plan review. Do not read the water permit as a data-center permit.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-08 · reported proposed

    Cayuga Operating Company (TeraWulf affiliate) signs 80-year lease on 183-acre former Cayuga Power Plant site

    Open cited source →

  2. 2025-12 · reported proposed

    Lansing Zoning Board of Appeals rules (December 22) that data center qualifies as permitted general processing land use

    Open cited source →

  3. 2026-01 · reported proposed

    Tompkins County Legislature passes 12-1 resolution urging NYSDEC to reject water withdrawal permit; town debates year-long construction moratorium

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID terawulf-lansing-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →