Facility snapshot
- Operator as published
- TeraWulf
- Address and locality
- Lansing · Tompkins County · New York
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 400 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001441
What the source record says
Site is the former Cayuga Power Plant (coal-fired, retired). NYSDEC water permit application for Cayuga Lake withdrawal was originally filed in 2021 for 'unspecified future use.' Permit dates to 1955 without modern monitoring requirements per opposition. TeraWulf also has a separate cryptomining operation at the Susquehanna site in PA (Nautilus). Operating entity: Cayuga Operating Company (acquired plant). NO STATUS CHANGE. The April 2026 DEC water-withdrawal/SPDES action is explicitly for the existing power plant's current operations, not the data center; DEC states it is 'not associated with the proposed data center'. As of the sources fetched 2026-09-09 the project remains proposed and had not cleared local site-plan review. Do not read the water permit as a data-center permit.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-08 · reported proposed
Cayuga Operating Company (TeraWulf affiliate) signs 80-year lease on 183-acre former Cayuga Power Plant site
- 2025-12 · reported proposed
Lansing Zoning Board of Appeals rules (December 22) that data center qualifies as permitted general processing land use
- 2026-01 · reported proposed
Tompkins County Legislature passes 12-1 resolution urging NYSDEC to reject water withdrawal permit; town debates year-long construction moratorium
Sources and attribution
- Tompkins County Legislature Urges State to Deny Water Permit for Lansing Data Center · Ithaca.com
- Tensions Over TeraWulf Data Center in Tompkins County Grow With Threatened Lawsuit · The Cornell Daily Sun
- TeraWulf Affiliate Approved to Draw 1 Million Gallons Per Day From Cayuga Lake · The Cornell Daily Sun
- Data Center Developer Secures Long-Term Lease of Cayuga Power Plant · The Ithaca Times
- Seneca supervisors hear concerns about data center, approve funding and equipment purchases · FingerLakes1.com
- TeraWulf secures zoning approval for NY data center · Yahoo Finance
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID terawulf-lansing-ny. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.