Licensed lead · not independently verified · dcd-dir-001230

Quantum Frederick

reported under construction

TPG Real Estate Partners / Catellus Development Corporation

5601 Manor Woods Rd · Frederick · Frederick County · Maryland

Capacity not statedSource updated 13 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
TPG Real Estate Partners / Catellus Development Corporation
Address and locality
5601 Manor Woods Rd · Frederick · Frederick County · Maryland
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
13 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001230

What the source record says

This record is the master-planned 2,100-acre park itself (the former Alcoa Eastalco Works site), NOT a duplicate of any single tenant building. The individual tenant campuses already tracked separately in this dataset -- Aligned Data Centers IAD-04/IAD-06 (aligned-quantum-frederick-md, aligned-iad-06-frederick-md) and Rowan Digital Infrastructure Bauxite I/II/III (rowan-digital-frederick-md, rowan-bauxite-ii-frederick-md, rowan-bauxite-iii-frederick-md) -- sit on parcels within this same park and should NOT be re-summed against this record's acreage. Original developer Quantum Loophole, Inc. was removed from active management/development of the project in a Dec. 2025 dispute settlement with its financial partner TPG Real Estate; TPG now serves as Manager and its affiliate Catellus Development Corporation as Developer, per Catellus's own statement ('TPG Real Estate and Quantum Loophole, Inc. have resolved their dispute over management and development of the 2,100-acre data center campus... Quantum Loophole will no longer have any active involvement in managing or developing the Project.'). The Frederick County Council separately created a Critical Digital Infrastructure Overlay Zone in January 2026 that expanded the area eligible for data-center development around this site by nearly 1,000 acres, but that is a zoning designation, not confirmed additional owned/developed acreage, so it is not included in landAcres here. CORRECTION: this record's `notes` field states the Quantum Loophole / TPG dispute was resolved in a 'Dec. 2025 dispute settlement.' Primary sources -- Catellus's own statement and Quantum Loophole's own statement, both published/dated 2024-12-23 -- show the settlement and mutual litigation dismissal occurred in DECEMBER 2024, not December 2025. The operator field and the substance of what happened (Quantum Loophole removed from active management/development, TPG + Catellus took over) are already correct and need no change -- only the year cited in the notes prose is wrong. Re-checked 2026-09-13 for any further operator/ownership change since: found none; TPG Real Estate / Catellus Development Corporation remain the manager/developer of record, no new litigation found.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID quantum-frederick-campus-md. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →