Licensed lead · not independently verified · dcd-dir-000991

Microsoft Mount Pleasant Data Center Campus

reported operational

Microsoft

Mount Pleasant · Racine County · Wisconsin

Planned 1,000 MWSource updated 14 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Mount Pleasant · Racine County · Wisconsin
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000991
Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · reported proposed

    Site reported as part of Microsoft's $80B global AI data center investment plan

    Open cited source →

  2. 2025 · reported under construction

    Construction active; Racine County site confirmed

    Open cited source →

  3. 2026-08-04 · reported operational

    Microsoft announced June 23, 2026 that its first Fairwater datacenter facility in Mount Pleasant is fully operational (equipment came online April 2026), with nearly 550 employees on site; a second adjacent facility remains under construction (targeted 2028).

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-mount-pleasant-wi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →