Licensed lead · not independently verified · dcd-dir-000983

Microsoft Hickory Data Center

reported under construction

Microsoft

Hickory · Catawba County · North Carolina

Capacity not statedSource updated 15 August 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Hickory · Catawba County · North Carolina
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
15 August 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000983

What the source record says

Coordinates are a Hickory city-level approximation — the sources describe the parcel only as ~160 acres west of US 321 adjacent to Hickory Lincolnton Hwy. No per-site capacity or investment disclosed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-11 · reported proposed

    Announced as part of Microsoft's four-site Catawba County plan; ~160 acres west of US 321 adjacent to Hickory Lincolnton Hwy (a smaller ~16-acre Tate Blvd parcel was also identified).

    Open cited source →

  2. 2026-03-02 · reported under construction

    Construction resumed across the Catawba County campuses after a roughly 10-month pause.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-hickory-catawba-county-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →