Licensed lead · not independently verified · dcd-dir-000980

Microsoft Granger Data Center

reported under construction

Microsoft

Granger · St. Joseph County · Indiana

Planned 1,000 MWSource updated 30 May 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Granger · St. Joseph County · Indiana
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
30 May 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000980

What the source record says

Former St. Joe Farm, near Bittersweet Road and Currant Road, Granger IN (St. Joseph County). 939 acres; 5-6 buildings planned; ~1 GW power load estimated by county officials. Microsoft not seeking local tax incentives. Status downgraded from 'under_construction' to 'permitted': WSBT source (cited in original record for the construction claim) explicitly states 'no construction has begun' and no formal site plan submitted; WNDU March 2026 MOU covers pre-development evaluation only. Confidence downgraded to 'reported' pending construction confirmation. Coordinates are approximate Granger unincorporated community area.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · reported proposed

    Microsoft acquires 939-acre St. Joe Farm near Currant and Cleveland Roads, Granger IN for $77.5M; site adjacent to Indiana Toll Road; county rezones land

    Open cited source →

  2. 2026-03 · reported permitted

    St. Joseph County Redevelopment Commission and City of Mishawaka approve MOU for pre-development work; $12.6M cap for early design and infrastructure evaluation; construction authorization pending resolution of utility and site plan questions

    Open cited source →

  3. 2026-05-30 · reported under construction

    Physical construction underway as of late May 2026 — active site earthwork, water trucked in for dust suppression, and the county highway department monitoring construction traffic. Follows the St. Joseph County MOU approval (March 17, 2026) and groundbreaking in late April/early May 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-granger-in. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →