Licensed lead · not independently verified · dcd-dir-000973

Microsoft Fairwater Atlanta (Azure AI Superfactory)

reported operational

Microsoft

Fayetteville · Fayette County · Georgia

Planned 1,500 MWSource updated 26 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Fayetteville · Fayette County · Georgia
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000973

What the source record says

615-acre, up-to-13-building QTS-built campus on Hwy 54W near Fayetteville, Fayette County (Microsoft's materials say 'Atlanta'). Began operation Oct 2025 as Fairwater 2 — a 'multi-gigawatt' AI campus. ~1,500 MW is the anticipated ultimate Georgia Power load across all buildings (planned figure; ~433 MW cited as initially online). Distinct from Microsoft's smaller Tyrone, GA campus. Two-story design with no UPS or backup generators. Coordinates are the Fayetteville area centroid. Microsoft has not disclosed tenant capex for the Fairwater Fayetteville space; the ~$1B/$6.5B figures are QTS developer build-out estimates for the full multi-tenant campus, and the widely-cited $14.5M abatement / $1.8B / $75M figures attach to different Microsoft/Fulton-County sites (the $75M was FCDA land-sale proceeds, not a subsidy to QTS) -> investmentUsd omitted.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10 · reported operational

    Microsoft's Atlanta Fairwater AI datacenter began operation in October 2025 — the second in the Fairwater family; two-story, no UPS/gensets

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-fairwater-fayetteville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →