Lancium Clean Campus (Crusoe / Stargate Site 1)

reported operational

Crusoe

Abilene · Taylor County · Texas

Planned 1,200 MWOperational 200 MWSource updated 26 July 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Crusoe
Address and locality
Abilene · Taylor County · Texas
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 200 MW; Planned: 1,200 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000856

What the source record says

Originally proposed Dec 2021 as Lancium's "Project Artemis" — a Bitcoin-mining and grid-demand-response campus using stranded/curtailed West Texas wind and solar power, with Lancium throttling load during ERCOT peak demand. Crusoe Energy has since built and operates AI/HPC data-center buildings on the site (publicly branded "Stargate Site 1"), with Oracle Cloud Infrastructure as the tenant hosting NVIDIA GPU clusters for OpenAI's Stargate project — Oracle sits contractually between Crusoe and OpenAI; no confirmed direct OpenAI-Crusoe lease. Lancium retains land/electrical-infrastructure ownership; Crusoe leases and operates part of an approximately 800-1,000-acre campus. First 2 of 8 planned buildings (~200+ MW) were operational by mid-2025; remaining 6 are under construction, with a full 1.2 GW build-out targeted for completion in 2026-2027 (dates vary by source). Construction-workforce and total AI-era investment figures conflict significantly across sources (reported range: 2,000-9,000 workers; an unverified ~$11.6B raise) and are not repeated here as fact. Coordinates are approximate (geocoded from a listed street address, not parcel-confirmed — the ~800-1,000-acre campus could place any specific building up to ~1-2 miles from this point). Also known as the Lancium Clean Campus.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021-12 · reported proposed

    Lancium announces "Project Artemis": a Bitcoin-mining/grid-demand-response campus with Taylor County and the City of Abilene, projected at up to $2.4B over 20 years, scaling 200 MW to 1 GW.

    Open cited source →

  2. 2024 · reported under construction

    Crusoe Energy begins building AI/HPC data-center buildings on the Lancium campus, pivoting the site from its original crypto-mining plan toward multi-tenant AI hosting (publicly branded "Stargate Site 1").

    Open cited source →

  3. 2025-06 · reported operational

    First 2 of 8 planned buildings (~200+ MW) operational, hosting Oracle Cloud Infrastructure GPU capacity for OpenAI's Stargate project.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID lancium-crusoe-abilene-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →