This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Crusoe
- Address and locality
- Victoria · Victoria County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000348
What the source record says
Crusoe-developed AI factory campus at the Port of Victoria, powered by Blue Energy (natural-gas bridge as early as 2028, nuclear targeted ~2031). Distinct from Crusoe's Stargate Abilene campus. ~1.5 GW planned. Coordinates are the Victoria area centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-10 · reported proposed
Blue Energy and Crusoe announced a nuclear-powered AI factory campus at the Port of Victoria; gas bridge power ~2028, nuclear ~2031
Sources and attribution
- Blue Energy and Crusoe partner to develop nuclear-powered AI data center · Crusoe
- Crossroads Today — Data centers spark debate in Victoria County Commissioners Court
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID crusoe-blue-energy-victoria-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.