Facility snapshot
- Operator as published
- Crusoe
- Address and locality
- Warrenton · Warren County · Missouri
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 7 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000351
What the source record says
Coordinates approximate. Site address: 22151 NW Service Road, Warrenton MO; north of NW Service Road, west of Hwy. W. Two 805,000 sq ft data center buildings + 40,000 sq ft administration building + 621,250 sq ft Ameren-owned switch yard + 603,200 sq ft Crusoe-owned electrical substation. Crusoe described as its 'fifth campus' in its national AI data center portfolio as of June 2026 per Crusoe newsroom. Meta signed agreement with Crusoe in June 2026 for approximately 1.6GW of AI computing capacity split across Childress TX and Warrenton MO campuses — per-site split not disclosed; confirms Warrenton as AI anchor customer site (sourceRef 3). Status: conditional use permit and site plan approved; land disturbance review and construction permits still outstanding before groundbreaking. Crusoe committed publicly to seek no real property tax or gross receipt tax abatements; would pursue state incentives only (sourceRef 2). Developer projected annual property taxes ~$80M/year (sourceRef 1), with ~$44M to local schools. Construction jobs projected ~2,000-2,500 over ~3-year build; permanent tech jobs projected ~100 (developer estimates, sourceRef 1 and 2 — not firm contractual commitments). Crusoe historically used on-site flared natural gas but divested those operations; Warrenton campus is grid-connected via Ameren Missouri — no on-site gas generation reported here. Distinct from the Google/Crusoe 'Goodnight' campus in Armstrong County TX.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · reported proposed
Crusoe named as developer at Warrenton Board of Aldermen meeting on November 4, 2025; announcement made by Greater Warren County Economic Development Council consultant.
- 2026 · reported permitted
Warrenton Planning & Zoning Commission approved conditional use permit and site plan 8-2 on January 8, 2026; Board of Aldermen approved unanimously (two 6-0 votes) on January 20, 2026. Still requires land disturbance review and construction permits before groundbreaking.
Sources and attribution
- Crusoe data center could be built west of St. Louis, Missouri · Data Center Dynamics
- Warrenton aldermen approve data center site plan near I-70 · Fox 2 Now
- Site plan for large-scale data center approved in Warrenton · Mid Rivers Newsmagazine
- Meta signs 1.6GW capacity deal with Crusoe spanning Texas and Missouri campuses · MLQ.ai
- Crusoe's Contracted AI Infrastructure Capacity Approaches 5 Gigawatts · Crusoe (newsroom)
- Crusoe named as developer for data center project · Warren County Record
- Warrenton Planning and Zoning approves data center site plan, conditional use · Warren County Record
- Warrenton planning commission approves data center ordinance amid resident concerns · First Alert 4
- Ameren Missouri signed confidential contracts with multiple big data centers · St. Louis Public Radio