Licensed lead · not independently verified · dcd-dir-000828

Iron Mountain White Oak Technology Park Campus

reported proposed

Iron Mountain

Henrico · Henrico County · Virginia

Planned 200 MWSource updated 23 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Iron Mountain
Address and locality
Henrico · Henrico County · Virginia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified)
Source freshness
23 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000828

What the source record says

6110 Technology Creek Drive, Henrico County (Richmond metro area). White Oak Technology Park has fiber connections and subsea cables to three continents. Henrico County passed stricter data center requirements June 2025, including 500-foot tree buffer near residential. investmentUsd is stated as 'more than $1 billion' — treated as floor.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-11 · reported proposed

    Iron Mountain CEO announced plans on Q3 2024 earnings call; company acquired 66-acre site at 6110 Technology Creek Drive from Henrico EDA for $8M. Four-building, 1 million+ sq ft campus planned. No build timeline shared.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID iron-mountain-white-oak-henrico-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →