This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Iron Mountain
- Address and locality
- Westview · Miami-Dade County · Florida
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 16 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000821
What the source record says
150,000 sq ft. Classified a "telecom hub" rather than "data center" under Miami-Dade county code. Opens 2026.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported under construction
150,000 sq ft facility in Westview, Miami; opens 2026.
Sources and attribution
- Iron Mountain breaks ground on first data center in Miami · Data Center Dynamics
- Westview fumes as quiet AI fortress rises in Miami backyard · Hoodline
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Iron Mountain solution guide — MIA-1 Miami: "By mid 2026 this 150,000 ft2 AI-ready facility will phase up to support 16 MW of customer IT load based on 26 MVA of redundant operational power"; Tier III, 3.4-acre site · Iron Mountain
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID iron-mountain-mia-1-miami-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.