Facility snapshot
- Operator as published
- DataBank
- Address and locality
- Red Oak · Ellis County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 480 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000416
What the source record says
292-acre, 8-building campus. Distinct operator/site from Compass Datacenters' separate Red Oak, TX campus (same town, different companies).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported under construction
$2B loan secured; first building operational before end of 2026.
Sources and attribution
- DataBank — $2 billion construction loan for the Dallas-area data center campus · DataBank
- Bisnow — DataBank Secures $2B Construction Loan For Red Oak Data Centers
- DataBank — Red Oak Campus (operator site)
- Dallas Innovates — DataBank Announces New 480MW North Texas Data Center Campus Featuring Eight Two-Story Data Centers
- DataBank Secures $2.0B of Construction Financing for First Three Data Centers on New South Dallas Campus · DataBank
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID databank-red-oak-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.