This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Compass Datacenters
- Address and locality
- Statesville · Iredell County · North Carolina
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 500 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000305
What the source record says
333-acre site in Statesville, Iredell County; five buildings, ~500 MW (per JLL marketing), near a Duke Energy substation. Rezoned Sept 2025; Duke's Feb 2026 8-K referenced ~4.5 GW of contracted large load including Compass and Microsoft. Coordinates are the Statesville area centroid.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported proposed
Statesville City Council rezoned a 333-acre site for a Compass Datacenters campus (5 buildings, ~500 MW); Duke Energy contracted power per a Feb 2026 8-K
Sources and attribution
- Compass Datacenters proposes 333-acre campus in Statesville, North Carolina · Data Center Dynamics
- Duke Energy Form 8-K (Feb 2026) — large-load contracts · U.S. SEC / Duke Energy
- WBTV — "Statesville City Council approves rezoning request for new data center"
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID compass-statesville-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.