Licensed lead · not independently verified · dcd-dir-000303

Compass Datacenters Lauderdale County Hyperscale Campus

reported under construction

Compass Datacenters

Meridian · Lauderdale County · Mississippi

Planned 500 MWSource updated 14 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Compass Datacenters
Address and locality
Meridian · Lauderdale County · Mississippi
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 500 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000303

What the source record says

Eight-data-center campus over an eight-year buildout at the I-20/59 Industrial Park, Meridian. Groundbreaking Jan 28 2025 (under construction). Mississippi Power to supply ~500 MW via a dedicated substation. INVESTMENT OMITTED: the widely cited $10B is a projected full-occupancy total INCLUDING future tenants' IT equipment ('an investment of $10 billion, including future tenants' information technology equipment'), not a firm Compass outlay. 'Thousands of jobs' is a projection. First confirmed tenant: Corderill LLC ($100M equipment, 20 jobs, April 2026). Coordinates are the Meridian centroid (no parcel coordinates published).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01-09 · reported proposed

    Campus announced by Compass Datacenters; confirmed by the Mississippi Development Authority and Governor's office

  2. 2025-01-28 · reported under construction

    Official groundbreaking ceremony at the I-20/59 Industrial Park, Meridian

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID compass-lauderdale-meridian-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →