BluSky AI Delta Data Center

reported proposed

BluSky AI Inc.

Delta · Millard County · Utah

Planned 50 MWSource updated 25 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
BluSky AI Inc.
Address and locality
Delta · Millard County · Utah
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 50 MW (source-reported; boundary not independently verified)
Source freshness
25 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000200

What the source record says

A specific 25-acre BluSky AI parcel and building within Creekstone Energy's already-tracked Delta Gigasite campus (creekstone-delta-ut) — tracked separately because it is a distinct operator/tenant with its own land agreement, consistent with how this tracker distinguishes co-located operators elsewhere. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Millard County Commissioner Bill Wright is on the record (Utah Business, Nov 2025) extending the county's standing "no special treatment" statement to name Creekstone Energy's Delta Gigasite — where BluSky AI holds a 50 MW agreement — specifically: "the county did not give either development any special treatment or incentives to bring the historic data centers to the area." Delta City's own Boards and Commissions page lists no Community Reinvestment Agency or Redevelopment Agency among its active public bodies. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07-29 · reported proposed

    BluSky AI signed a non-binding Letter of Intent with Creekstone Energy LLC to acquire 25 acres with up to 50MW of capacity within the Delta Gigasite development; transaction expected to finalize Q4 2025 with groundbreaking projected late 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID blusky-ai-delta-millard-county-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.