This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- BluSky AI Inc.
- Address and locality
- Milford · Beaver County · Utah
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 9.3 MW (source-reported; boundary not independently verified)
- Source freshness
- 25 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000201
What the source record says
BluSky AI's first secured modular 'SkyMod' site, distinct from its Nephi (Juab County) and Delta (Millard County) sites already/also tracked; 51.6 acres leased from Wild Mustang Ventures LLC. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. BluSky AI's own SEC-filed Form 8-K and the underlying Ground Lease with Option to Purchase (Wild Mustang Ventures, LLC, June 30, 2025) were read directly and contain no property-tax, abatement, tax-increment-financing, or PILOT provisions. Neither Milford City (four active public bodies, none a CRA/RDA) nor Beaver County has a Community Reinvestment Agency or Redevelopment Agency; Milford City's own "Economic Development" link points off-site to a county tourism page, not an incentive program. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-06-30 · reported proposed
BluSky AI executed a Ground Lease with Option to Purchase for the site with Wild Mustang Ventures LLC and a Power Assignment Agreement with Digital Asset Management, LLC.
Sources and attribution
- BluSky AI Inc. Secures First Site with 9.3MW to Launch Flagship Data Center in Central, Utah · GlobeNewswire (via Manila Times)
- BluSky AI Inc. Form 8-K (filed July 7, 2025) — Milford, Beaver County power and ground-lease terms · U.S. Securities and Exchange Commission (EDGAR)
- Ground Lease with Option to Purchase — BluSky AI Inc. and Wild Mustang Ventures, LLC (June 30, 2025), Exhibit 10.2 to Form 8-K · U.S. Securities and Exchange Commission (EDGAR)
- Boards & Commissions — Milford City (no Redevelopment Agency or Community Reinvestment Agency listed) · Milford City
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID blusky-ai-milford-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.