This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- BluSky AI Inc.
- Address and locality
- 1358 N 200 W, Nephi, UT · Nephi · Juab County · Utah
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Planned: 4 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000202
What the source record says
Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy found. Nephi City's Community Reinvestment Agency fund is tied to a hotel project area rather than this site, and no CRA participation agreement naming this project was located. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing. Recorded as no-evidence-found rather than a fully closed absence: the Nephi project-area budget PDF did not return readable text on retrieval.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- BluSky AI Inc. Signs Letter of Intent to Lease Strategic Site in Nephi, Utah for Modular AI Infrastructure Expansion · National Law Review (company press release, September 2025)
- Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026) · Kem C. Gardner Policy Institute, University of Utah
- Nephi City — Community Reinvestment Agency fund · Nephi City
- BluSky AI Inc. Form 8-K Exhibit 99.1 — Letter of Intent for Nephi, UT Site · SEC EDGAR
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID blusky-ai-nephi-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.